| CONTACT VOLTAGE RATING IN VOLTS | 28.0 DC AT SEA LEVEL |
| 300.0 HIGHEST AC VOLTAGE RATING AT SEA LEVEL |
| 115.0 LOWEST AC VOLTAGE RATING AT SEA LEVEL |
| CONTACT LOAD CURRENT RATING | 500.0 MILLIAMPERES RESISTIVE LOAD AND |
| 50.0 MILLIAMPERES INDUCTIVE LOAD DC AT SEA LEVEL |
| 50.0 MILLIAMPERES RESISTIVE LOAD HIGHEST AC VOLTAGE RATING AT SEA LEVEL |
| 125.0 MILLIAMPERES RESISTIVE LOAD LOWEST AC VOLTAGE RATING AT SEA LEVEL |
| TERMINAL TYPE | TURRET |
| SWITCH ACTUATOR INDEXING POSITION QUANTITY | 24 SINGLE ACTUATOR |
| STYLE DESIGNATOR | TAP, SQUARE FRAME |
| OVERALL LENGTH | 3.562 INCHES MAXIMUM |
| OVERALL HEIGHT | 2.750 INCHES MAXIMUM |
| OVERALL WIDTH | 2.750 INCHES MAXIMUM |
| INDIVIDUAL SECTION QUANTITY | 1 |
| SWITCH CONTACT BASIC DESIGN | NONPILE-UP SYMMETRICAL |
| POLE QUANTITY | 1 SINGLE SECTION REAR |
| THROW QUANTITY | 24 SINGLE SECTION REAR |
| CONTACT SWITCHING ACTION | BREAKS BEFORE MAKES SINGLE SECTION FRONT |
| SWITCH ACTUATOR POSITIONING INCREMENT | 15.0 DEGREES SINGLE ACTUATOR |
| SHAFT TYPE | ROUND SINGLE ACTUATOR |
| SHAFT DIAMETER | 0.250 INCHES NOMINAL SINGLE ACTUATOR |
| SHAFT LENGTH | 2.000 INCHES NOMINAL SINGLE ACTUATOR |
| MOUNTING METHOD | THREADED HOLE 1ST MOUNTING FACILITY |
| THREADED HOLE 2ND MOUNTING FACILITY |
| THREAD SERIES DESIGNATOR | UNC SINGLE MOUNTING FACILITY |
| NOMINAL THREAD SIZE | 0.164 INCHES SINGLE MOUNTING FACILITY |
| THREAD CLASS | 2B 1ST MOUNTING FACILITY |
| 2B 2ND MOUNTING FACILITY |
| THREAD QUANTITY PER INCH | 32 SINGLE MOUNTING FACILITY |
| MOUNTING FACILITY PATTERN | FOUR POSITION TRAPEZOID 1ST MOUNTING FACILITY |
| FOUR POSITION TRAPEZOID 2ND MOUNTING FACILITY |
| LONGEST HORIZONTAL DISTANCE BETWEEN MOUNTING CENTERS | 1.750 INCHES NOMINAL 1ST MOUNTING FACILITY |
| 2.000 INCHES NOMINAL 2ND MOUNTING FACILITY |
| SHORTEST HORIZONTAL DISTANCE BETWEEN MOUNTING CENTERS | 0.125 INCHES NOMINAL 1ST MOUNTING FACILITY |
| 0.375 INCHES NOMINAL 2ND MOUNTING FACILITY |
| INTERMEDIATE HORIZONTAL DISTANCE BETWEEN MOUNTING CENTERS | 1.750 INCHES NOMINAL 1ST MOUNTING FACILITY |
| 2.000 INCHES NOMINAL 2ND MOUNTING FACILITY |
| LONGEST VERTICAL DISTANCE BETWEEN MOUNTING CENTERS | 1.750 INCHES NOMINAL 1ST MOUNTING FACILITY |
| 2.000 INCHES NOMINAL 2ND MOUNTING FACILITY |